Footings

Not quite the start of the project. Footings with the foundation walls part done. This picture shows the concrete piers being formed with ply boxing, the near one done and the far one in construction. The piers were later drilled and studs stuck in with KEM-II which is great stuff and also holds the wall plate that supports the roof to the house. Before this I had to move the drains, both soil and rainwater.